Multi Project Planning with ACOS PLUS.1 Using a Resource Pool
Local single project processing with common resource pool in multiple project environment
1. Definition of the
Multi Project Resource Pool
2. Definition of the
Resources
for all cost accounts
3.
Calendar
Input of holidays, breakdowns and shift-work times
Generation of the individual pool projects out of a
Standard Project
using common project and organization structure
Interactive resource allocation using the
Multi Projekt Resource Pool
The three steps of
Capacity Planning
introduction of capacitive relationships
resource levelling within the deadlines
resource scheduling with optimized utilization of the limited resources
- using fixed activity duration
- with variable activity durationn
- non-linear resource distribution over activity duration
- replacing wildcard resources by individual resources
In the individual
Pool projects
the links to activities of other projects using the same pool are highlighted
to display dependencies due to the global capacity planning.